Highlights

16 March 2016  Jom Sihat

15 March 2015  Lawatan Anak Anak Program Better Brighter

The only power plant in Malaysia with triple fuel firing capability

Gas Turbine were installed in 1993 with 2 x 100 MW units.

KEV is very committed in ensuring the environment is well taken care of by having series of EIA studies.

KEV ash pond is sanctuary for migratory birds stopping