• 9 open cycle gas turbines were installed in 1993-94 (all but 2 units have since been decommissioned, sold or relocated)‏
  • Current nominal capacity:       2 units x 110MW
  • Open Cycle Mode
  • Manufacturer : Nuovo Pignone
  • Type : GE Frame 9
  • Commissioned –
  • GT 8 – Aug 94
  • GT 9 – Sept 94
  • Fuel : Gas / Distillate