Phase                               Capacity

GF 1 (thermal)               2 x 300 MW

GF 2 (thermal)               2 x 300 MW

GF 3 (thermal)               2 x 500 MW

GF 4 Gas Turbines        2 x 110 MW

TOTAL CAPACITY           2420 MW

Generating Facility 1

  • Construction began in 1981
  • Nominal capacity:       2 units x 300 MW
  • Conventional Thermal
  • Front firing
  • Fuel – Gas / Oil
  • Manufacturers:     Boiler – Riley Mitsui Turbine – MHI
  • Commissioned in 1985 & 1986
  • Initial commissioning in oil
  • Unit 2 gas firing commissioned in 1991, Unit 1 in 1994

Generating Facility 2

  • Construction began in 1985
  • Nominal capacity: 2 units x 300 MW
  • Conventional Thermal
  • Opposite firing
  • Fuel – Coal / Gas / Oil
  • Manufacturers:   Boiler – IHI     Turbine – MHI
  • Commissioned in 1988 (Unit 3), 1989 (Unit 4)‏
  • Gas commissioning for Units 3 & 4 in 1999

Generating Facility 3

  • Construction began in 1995
  • Nominal capacity:   2 units x 500 MW
  • Conventional Thermal
  • Opposite firing
  • Fuel – Coal / Gas / Oil (25% rated load)‏
  • Manufacturers:   Boiler – IHI   Turbine – GE
  • Taking over in year 2000