Station Janaeletrik Sultan Salahuddin Abdul Aziz or Kapar Energy Vetures
Located 56km west of Kuala Lumpur , off the coastal road between Port Klang and Kuala Selangor facing the straits of Malacca.
SJSSAA is the 2nd largest power plant in Malaysia with a generating capacity of 2420MW.
The only power station in Malaysia with triple fuel firing capability(gas, oil and coal)
Planning for the power plant started in late 1970 by NEB while the construction work commenced in 1981. It was constructed on a reclaimed mangrove swampland.
The plant is officially opened by Sultan Selangor on 14/3/1987.
After about 20year of operation under LLN and TNB, KEV is formed as an IPP on 9th July 2004 and fully run with the equity of 60% TNB and 40% Malakoff.